Press Statement of President of the Republic of Indonesia after the Inspection of Taman Mini Indonesia Indah LRT Station in East Jakarta, DKI Jakarta Province, December 26, 2022

By Office of Assistant to Deputy Cabinet Secretary for State Documents & Translation     Date 26 Desember 2022
Category: Press Statement @en
Read: 39 Views

Journalist

How was your experience after riding the LRT train, Sir?

President of the Republic of Indonesia (Joko Widodo)

Yes, I, along with Ministers, rode the LRT train from the Harjamukti station to TMII station. For these 9 kilometers, it takes 12 minutes at the speed of 80 kilometers per hour. It was very fast and without locomotive engineer. It is also our pleasure, our proud that the LRT was manufactured by state-owned train manufacturer PT Industri Kereta Api (INKA) including the unmanned train system.

All was manufactured by PT INKA. The train with a capacity of 420 passengers, train station with a capacity of 520 passengers are expected to be operational in June-July 2023 along with the [Jakarta-Bandung] high-speed railway.

Journalist

Which part is still under development until July [2023], Sir?

President of the Republic of Indonesia (Joko Widodo)

Yes, the progress is still 87 percent. The construction of train depots and things related the system synchronization must still need to be resolved. I noticed that [the system synchronization] is still not quite right.

Journalist

How is the evaluation, Sir?

President of the Republic of Indonesia (Joko Widodo)

It was comfortable, swift, less noisy. I noticed that there was a light noise that goes like ciiit when the train turned. (AP/EP)

Latest Press Statement @en